Roofs and terraces are the surfaces of a building most directly exposed to rain, snow, UV radiation and day-night temperature swings. When their waterproofing is missing or worn out, the consequences show quickly: damp stains and blistering paint on top-floor ceilings, corrosion of the concrete reinforcement, spalling plaster and steadily growing repair costs. The point where a leak appears is very often not the point where water enters the structure, which is why roof waterproofing is not a job to patch over with paint or minor repairs but a technical problem whose source has to be identified correctly.

A lasting solution depends on getting two things right: selecting a system that matches how the roof is used and its current condition, and executing the details flawlessly at drains, parapets, chimney bases and expansion joints. In practice, most failures originate not on the open field of the roof but at these details. Applying the right material with the wrong details produces the same outcome as applying the wrong material with the right details: a leak that keeps coming back.

EREL Yalıtım, with an engineering-driven approach built on its founding team's more than 20 years of industry experience, carries out roof and terrace waterproofing across Istanbul — for homeowners, international property owners and B2B contractors alike. The entire process, from survey and system selection to application and handover, runs turnkey and to a technical specification, using systems from leading global manufacturers.

Where Is Roof Waterproofing Needed? Accessible and Non-Accessible Roofs

Roof waterproofing comes up in three typical scenarios: building the system correctly from the start on a new building before the finish layers go on; renewing the waterproofing on an existing roof once leaks appear; and addressing waterproofing together with the renewal of the roof covering or thermal insulation. In all three cases the first step is the same: inspecting the existing layers, falls and drainage points on site. The trace of a leak on a ceiling can be metres away from the actual damage in the membrane, which is why no system should be proposed without a survey.

The first question that drives system selection is how the roof is used. On non-accessible roofs — surfaces reached only for maintenance — the waterproofing remains exposed as the final layer, so UV resistance comes first; slate-surfaced bituminous membranes or synthetic membranes are the usual choice. On accessible roofs and terraces, the waterproofing is planned for foot traffic and the load of the finish build-up: it is either covered with a protective screed and paving, or a liquid-applied system that can be walked on directly is used. A system chosen without making this distinction means either unnecessary cost or premature wear.

Whichever system is selected, the critical zones of the application are the same. In our site experience, the great majority of leaks originate at the following points:

  • Around roof drains and rainwater gutters
  • Parapet bases, wall junctions and coping undersides
  • Chimney, antenna and mechanical equipment plinths
  • Expansion joint lines and structural joints
  • Skylight edges and roof access door thresholds

Membrane or Liquid-Applied Waterproofing? System Options

Polymer-modified bituminous membrane application is the most widespread and proven method in roof waterproofing. The membranes are torch-welded at the seams and, on critical roofs, laid in two staggered layers, producing a continuous and verifiable water barrier. On non-accessible roofs, a slate-finished top membrane provides UV protection. We work with a range of proven product lines in these systems. The 2,500 m² Proof Membran installations we have completed at industrial facilities are among our reference projects for this system on large industrial roofs.

TPO and PVC synthetic membranes are lightweight single-layer systems whose seams are joined by hot-air welding. They offer advantages on wide-span industrial buildings, light metal roofs and fast-track projects, and can be detailed as mechanically fixed or ballasted. In this group we install a range of proven systems; a 1,200 m² Ravaproof application was also completed under this scope.

Liquid-applied waterproofing builds a seamless membrane from polyurethane, hybrid or cementitious elastic materials applied in coats by brush, roller or airless spray. Its strongest points are the absence of seams and easy adaptation to complex geometry, which is why it stands out on detail-heavy terraces and in refurbishment work. In this group we work with leading international systems. The final system choice is settled against the following criteria:

  • How the roof is used: accessible or non-accessible
  • Type of existing covering and whether it will be removed
  • Roof geometry, falls and density of details
  • Area, programme time and budget balance
  • Whether thermal insulation will be resolved in the same works

Terrace Waterproofing and Waterproofing over Existing Tiles

Because terraces are effectively accessible roofs, their waterproofing has to be planned together with the falls, drainage and finish layers as a whole. A classic terrace build-up consists of a screed to falls, the waterproofing layer, a protection layer and the finish. Minimum falls must carry water to the drain without interruption, the waterproofing must be turned up the parapets to a sufficient height, and the paving joints must be resolved so that they do not take in water. Terrace waterproofing lasts when this entire chain is built correctly.

On existing terraces in use, the question we hear most often is whether the tiles have to come up. Waterproofing over existing tiles can be done without removal, using polyurethane or hybrid liquid-applied systems, provided the substrate is sound and suitable for adhesion. Before application, the floor is checked for hollow and debonded areas, the joints and drain details are prepared, and the coats are applied over a system-compatible primer. With a UV-resistant top coat the surface can be walked on directly, and a new finish can be laid over it if preferred. Because this approach eliminates demolition, debris removal and re-tiling from the bill, it is a serious advantage in refurbishment work.

A terrace renovation is also the right opportunity to treat roof insulation as a whole. In the inverted roof detail, where thermal insulation is resolved together with the waterproofing, compression-resistant XPS boards are placed over the waterproofing layer; the membrane is protected from temperature swings and mechanical impact while the building's energy loss is reduced. We use leading thermal insulation products in the thermal insulation layers, combining the two insulation disciplines in a single project under a single responsibility.

The EREL Yalıtım Approach to Roof Waterproofing

EREL Yalıtım's way of working comes from its engineering roots: with our engineering team's approach, every project is assessed with material chemistry and substrate compatibility in mind. Which primer a bituminous membrane needs on which substrate, how a polyurethane coating will adhere to existing tiles, how a synthetic membrane's mechanical fixing should be detailed — these decisions are made on technical data, not guesswork. System details are finalised before work starts and the job is run to a technical specification.

Our references are the field record of this approach. We have completed thousands of square metres of Proof Membran and Ravaproof across industrial and residential projects; the application we carried out with a crystalline waterproofing system at a major airport's water reservoir demonstrates the company's technical competence on critical structures. The same discipline applies at every scale, from a residential roof to an industrial facility, which is also what makes us a dependable applicator for B2B contractors.

The process runs turnkey: survey, system proposal, removal and surface preparation, application, testing and handover are gathered under one responsibility. Our clients — including international property owners who manage their Istanbul buildings from abroad — carry no burden of coordinating separate crews; at every stage of the work, their single point of contact is EREL Yalıtım.

Our Application Process

  1. 1

    Free Site Survey and Fault Diagnosis

    The roof or terrace is inspected on site; the existing layers, falls, drains and leak traces are assessed to locate the point where water enters the structure.

  2. 2

    System Selection and Technical Proposal

    A system matched to the roof's use, the existing covering and the area is defined; a proposal based on a technical specification, covering application details and materials, is submitted.

  3. 3

    Surface Preparation

    Blistered and debonded layers are removed and the surface is cleaned; the falls are checked and, where needed, a screed to falls or a levelling layer is applied.

  4. 4

    Detailing of Critical Points

    Drain surrounds, parapet bases, pipe penetrations and expansion joint lines are prepared with fillets, detail tapes and collars; this is the most critical stage of the waterproofing.

  5. 5

    Primer and Main Waterproofing Layer

    After a system-compatible primer, the bituminous membrane is torch-welded, the synthetic membrane is laid, or the liquid-applied waterproofing is built up in coats; coat thicknesses and overlaps are checked.

  6. 6

    Inspection and Flood Test

    Seams and details are checked visually and physically; on suitable roofs, a ponding test is carried out to verify the watertightness of the system.

  7. 7

    Protection Layer and Handover

    Depending on the system, a UV-protected top coat, a protective screed or the finish is applied; the job is handed over together with a report documenting the completed application.

Frequently Asked Questions

How are roof waterproofing prices determined in Istanbul?

The price depends on the area, the system to be selected, the condition of the existing covering, the density of details and access to the roof. A figure quoted without seeing these variables is misleading. To give an accurate price we inspect your roof on site; simply contact us to book a free survey.

Can a terrace be waterproofed without removing the existing tiles?

Yes. If the substrate is sound and the adhesion checks pass, waterproofing can be applied over the existing tiles with polyurethane or hybrid liquid-applied systems. Once the joints and drain details are prepared, the seamless coating becomes directly trafficable with a UV-resistant top coat. If the floor shows widespread hollow or loose areas, local repairs are carried out first.

What is the difference between waterproofing an accessible and a non-accessible roof?

On non-accessible roofs the waterproofing layer remains exposed, so UV resistance comes first; a slate-surfaced membrane or a synthetic membrane is preferred. On accessible roofs and terraces, the waterproofing is planned for foot traffic and finish loads: it is covered with a protective screed and paving, or a walkable liquid-applied system is used. This distinction directly determines the system selection.

Should I choose a membrane or a liquid-applied system?

Both are lasting solutions when applied correctly; the choice depends on the conditions of the roof. On large, regular surfaces, bituminous membranes or synthetic sheets offer speed and control; on detail-heavy terraces and in refurbishments done without removing the finish, seamless liquid-applied systems stand out. At the survey, both options are presented with their technical justification.

In which season should roof waterproofing be done?

The ideal conditions are a dry substrate and the temperature range specified by the manufacturer, which makes spring, summer and autumn the most suitable periods. Work is also possible in dry winter weather, with the material selection and application plan adjusted accordingly. If a leak has already started, waiting for the season only grows the damage; at the very least, the survey for diagnosis and temporary measures should not be postponed.

How long does the work take, and can the building stay in use?

The duration depends on the area, the layers to be removed and the selected system; an average residential roof and a large industrial terrace do not follow the same programme. Since the work takes place at roof and terrace level, the everyday use of the building is uninterrupted in most projects. A clear work programme is provided after the survey.